This project is constructed in two phases under the EPC general contracting mode, with a total installed capacity of 5,918.545 kWp. The total project cost is approximately USD 2,585,023. The installed capacity of the first phase is 1,918.8 kWp, and the power grid connection mode of "self-consumption of the electricity generated with the surplus electricity fed into the grid" is adopted. The installed capacity of the second phase is 3,999.645 kWp, and the power grid connection mode of "full power grid connection at medium voltage" is adopted.