Power Engineering

Meili Primary School 346.905kWp Distributed Photovoltaic Power Generation Project Design, Procurement, and Construction General Contracting (EPC)

This project is constructed in the EPC general contracting mode, with an installed capacity of 346.905kWp. The project cost is approximately USD 160,655, and the power grid connection adopts the mode of "self-consumption of the electricity generated, with the surplus electricity fed into the grid".

/ En